Work scope
Identify new work, retained surfaces, removal and preparation.
Connect measurements, purchase quantities and quotation scope without treating a demo as a complete RAB.
Identify new work, retained surfaces, removal and preparation.
Record dimensions, deductions, units and allowance.
Match the rate to the product unit, destination and services.
Show quantity, allowance and price changes separately. A complete RAB requires the actual work items, specifications and relevant costs. A selected material demo does not automatically provide it.
Open a TB sample estimateIdentify rooms, floors, walls and retained finishes.
Record dimensions, openings and separate work items.
Check product coverage, allowance and whole packs.
Confirm preparation, delivery, handling and exclusions.
Use a uniform slab calculation without treating the material subtotal as a complete RAB.
Read the guideSeparate floor and wall work, preparation, allowance and package coverage before purchasing finishes.
Read the guideCompare product units, transport stages and site handling without assuming a national delivered rate.
Read the guideExplore quantities, material purchasing, editable costs and resources in TrendyBuilders. Choose capacity for your own work or a team.