Give the material price a destination and a delivery boundary.
Compare product units, transport stages and site handling without assuming a national delivered rate.
Start with the actual destination
Do not reuse a quotation for another location without confirmation. State where materials are required, the requested timing and whether collection or delivery is being priced. Where a route includes inter-island freight or transfer stages, ask which stages and handling services are included.
Use a common supplier enquiry
Give each supplier the same specification, quantity and commercial unit. Record quote date, validity and unanswered questions. A unit price at collection and a price delivered to the work area have different boundaries.
Check the block quantity
The wall example is 10 × 3 = 30 m² gross. Deducting 4 m² of openings gives 26 m² net. A nominal 0.4 × 0.2 m face yields 325 blocks before allowance. With the chosen 5% and rounding up, the quantity is 342.
At illustrative IDR10,000 per unit, the block subtotal is IDR3,420,000. The dimensions are demonstration inputs, not a standard Indonesian product claim. Confirm actual specification and commercial packs.
Separate the service around the product
Mortar, grout, reinforcement, lintels, finishes, labour, transport and tax are outside the block subtotal. Identify unloading equipment, the drop-off point, storage and handling to the work area. Ask whether staged delivery changes the package.
- List known freight and transfer charges separately.
- Confirm responsibility at each delivery stage.
- Record inclusions, exclusions and outstanding information.
- State whether tax is included or excluded without assuming treatment.
- Reconfirm after changes in product, quantity, destination or timing.
TB supports calculation and purchase planning. It does not quote transport routes, reserve stock or arrange freight. Confirm the actual commercial agreement directly before ordering.