Measure the volume. Define the scope. Plan the material purchase.Explore the global TB platform
FREE METRIC DEMOS

Read the formula behind the material subtotal.

Calculate uniform slab volume, whole blocks and tile boxes with editable IDR rates.

EDIT THE ASSUMPTIONS

Measure. Allow. Round. Review.

Defaults: 12.6 m³ concrete, 342 blocks and 23 boxes. Material-only examples, not a complete RAB.

Concrete slab: quantity & material cost

Adjust the dimensions, allowance and example rate. Review the formula behind the result.

IDR rates are illustrative editable inputs, not Indonesia market averages or supplier quotations. Review the actual product, allowance and delivery basis.

L × W × T
EXAMPLE MATERIAL SUBTOTAL
—

Build a detailed estimate in TB

This demo runs in your browser. Inputs are not saved or automatically transferred into a TB project.

KNOW THE BOUNDARY

One material calculation at a time.

Concrete

Uniform rectangular slab; 150 mm thickness is entered as 0.15 m.

Blocks

Editable nominal face dimensions, not a standard local product claim.

Tiles

Area plus allowance divided by actual box coverage, rounded to full boxes.

Use actual project information

Confirm dimensions, specifications, allowance and quotation scope before ordering. Rates are illustrative. Inputs stay in this browser without automatic saving or transfer.

Explore main TB calculators

BEFORE THE NEXT RENOVATION QUOTE OR MATERIAL ORDER

Give the next material estimate a clear basis.

Explore quantities, material purchasing, editable costs and resources in TrendyBuilders. Choose capacity for your own work or a team.

Make every allowance explainable.See plans