Connect measured surfaces to the actual product box.
Separate floor and wall work, preparation, allowance and package coverage before purchasing finishes.
Begin with the surface schedule
A room can contain retained finishes, removal and several new materials. List each floor and wall separately, with dimensions, openings, product reference and work description. One room area should not be reused as the quantity for every operation.
State the preparation boundary
Confirm protection, removal, disposal, levelling and making-good inclusions. Record uncertain existing conditions as questions for review. The calculator does not inspect the substrate or discover hidden defects.
Check the whole-box example
The demonstration floor measures 6 × 5 = 30 m². A chosen 10% allowance gives 33 m². With 1.44 m² coverage per box, the calculation gives 22.92 boxes, rounded up to 23. Purchased coverage is 33.12 m².
At illustrative IDR100,000 per box, the material subtotal is IDR2,300,000. Adhesive, grout, trims, preparation, installation labour, transport and tax are not included. The allowance is a planning input, not a rule for all layouts.
Verify the product and price unit
Use the actual coverage printed for the selected product. Confirm whether the quotation is per piece, box or square metre. Cuts, pattern, room shape and an agreed spare-material plan can change the purchase. Similar-looking products need not have the same packaging.
- Connect the product to its room and surface.
- Show measured area, allowance and full boxes separately.
- Record supply and installation responsibility.
- Confirm delivery, unloading and storage.
- Keep unfinished selections visible.
A purchase schedule helps explain quotation differences without implying that materials alone describe a complete installed finish or RAB. Product suitability and project requirements still need appropriate review.